( 02 )
Public seating
Concrete, broken tile, timber slats, a three-day sit test.
- Documented period
- 2026
- Location
- Shared spaces, Kelurahan Cipawitra, Tasikmalaya

The problem
When asked where they sit while waiting or gathering, residents pointed to whatever was there: steps, a wall, the ground. Seating that is sturdy, easy to maintain and actually used was the request.
Materials
- Base
- Concrete cast in timber formwork around a welded and wire-tied steel reinforcement gridDocumented
- Surface
- Broken floor-tile fragments pressed into the wet concrete, glazed side up, set flushDocumented
- Seat and backrest
- Timber slats on steel brackets, sanded and varnishedDocumented
- Finish
- Varnish on the timber; one batch redone after remote reviewProject record
Design and production

Ask the maker to criticise
The first sketch was shown to the makers with one request: tell me the worst part of this design. Dimensions and joints changed before anything was cut.

Reinforce, pour, press
Steel bars were welded and tied into a grid, timber formwork built around it, concrete mixed by hand and poured. Only then were tile fragments pressed into the surface.

It worked. It could be better.
The first chair was usable but looked unfinished. Rather than call it done, the team sanded and painted, then photographed before and after.

Three days in use before handover
Chairs were placed and used for three days before they were formally handed over. No structural problems were reported in that window.
Who did what
- Local makersWelding, cladding, finishing. Paid per job.
- ResidentsNamed the need; sat on the chairs for three days before accepting them.
- FounderSketched, asked for critique, called for the finish to be redone.
Outcome
Chairs are in place in shared spaces and have been seen in use. They are part of the nine installed units.
Figures
- Use test before handover
- 3 daysProject record
- Number of chairs
- Not yet published separatelyNot yet recorded
- Build time per chair
- Not yet recordedNot yet recorded
Challenges
- A concrete base is heavy: three people lift one. Moving units to public areas took a pick-up truck and careful handling.
- Finish quality is hard to judge from photographs; one batch had to be redone.
Lessons
- The physical object shows problems the sketch hides. Build one, look, then build the rest.
Current status
In use. Durability over the rainy season is the open question; a check is planned.